• 5 color temperatures in 1 SKU (2700K, 3000K, 3500K, 4000K, 5000K)
  • Super slim back-lit fixture for thin fixture depth
  • Suitable for indoor/outdoor applications in dry, damp, or wet environments
  • Dimmable, see Dimmer Compatibility List
  • Robust, die cast aluminum construction
  • Smooth diffused uniform light distribution
View Technical Specs
Performance
Watts 9W
Color Temp 2700/3000/3500/4000/5000K
Lumens 700 lm
Efficacy 77.8
Color Accuracy 90 CRI
L70 Lifespan 50,000 Hours
Type Constant Current
120V .10A
208V
240V
277V
Input Watts 9W
Dimensions
Link to Dimension Drawing

Weight: 0.8 lbs

Technical Specifications
Performance
Product Type
Round, Edge-Lit Wafer
Description
Round, edge-lit wafers with a slim form factor and selectable color temperatures. Available in 3", 4", 5", 6", and 8" models with either smooth or baffle trim, all with 90 CRI and TRIAC/ELV dimming.
Wattage Equivalency
60W Incandescent
Input Wattage
9W
Lumens (Nominal)
750lm
Lumens (Measured)
698lm @ 2700K; 728lm @ 3000K; 737lm @ 3500K; 785lm @ 4000K; 763lm @ 5000K
Efficacy
78lm/W @ 2700K;
98lm/W @ 3000K;
82lm/W @ 3500K;
87lm/W @ 4000K;
85lm/W @ 5000K
L70 Lifespan
50,000-Hour LED lifespan based on IES LM-70 results
Electrical
Driver
Constant Current, Class 2 60 Hz; 120V: 100mA
THD
≤20%
Power Factor
≥0.9
Dimmable
Yes, dimmable down to 10% on compatible TRIAC/ELV dimming systems. See Dimmer Compatibility List.
Input Voltage
120V
Operating Frequency
60 Hz
Operating Temperature
-4°F to 104°F (-20°C to 40°C)
LED Characteristics
Beam Angle
110°±10°
Color Temperature
Field adjustable via dip switch 2700/3000/3500/4000/5000K
Color Accuracy (CRI)
>90 CRI
R9 Value
High color performance with R9 greater than 50
Color Consistency
<4-step (2700K & 5000K) MacAdam Ellipse binning to achieve consistent fixture-to-fixture color
Color Stability
LED color temperature is warrantied to Shift no more than 200K in color temperature over a 5-year period
Color Uniformity
RAB's range of Correlated Color Temperature follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.
Installation
Remote Driver/Junction Box
Die-formed metal driver / junction box with captive hinged junction box cover. Listed for maximum of (4) 12AWG through branch circuit conductor suitable for 90° C permitted in box. Easy to wire in 2in/2out (plus ground) applications. (4) conduit pry-outs. (3) quick snap-in connectors for quick and reliable line voltage connections. Integral mounting facilitates direct mounting to building structure or mounting frame.
Mounting
Recessed, no housing required
Construction
Size
4"
Shape
Round
Finish
White
Enclosure Material
Metal+Plastic
Trim Style
Baffle
Lens Finish
Frosted
Lens
Polycarbonate light diffuser distributes light evenly and smoothly for general lighting applications
Compliance
Listings
UL Listed
Environment
Suitable for use indoors and outdoors in dry, damp, or wet environments.
IC Rated
Suitable for direct contact with insulation.
Type IC inherently protected, suitable for direct contact to air permeable insulation and cULus listed for damp locations. Not for use in direct contact with spray foam insulation, consult NEMA LSD57-2013.
Plenum Rated
Classified by UL 2043 Fire Test for heat and visible smoke release for discrete products and their accessories installed in air-handling spaces.
Air Tight
Housing certified Air Tight as per ASTM E283
Energy Star Approved
This product is ENERGY STAR® Certified.
Energy Star ID
3543885
DLC Listed
No
Certification Model Number
DLW0094(WFRL4R99FA120WBS)
California Title 20 Compliant
Can be used to conform with the requirements of California Title 20
California Title 24 JA8 Compliant
Can be used to conform with the requirements of California Title 24 Part 6.
California Energy Commission (CEC) Status
Lawful for Sales in California
NEC Compliant
Suitable for use in closets. Compliant with NEC Sec. 410.16 (A)(1) and 410.16 (C3).
IESNA LM-79 & LM-80 Testing
RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.
RoHS
Mercury and UV free. RoHS-compliant components.
FCC
Complies with Part 15 of the FCC Rules
Trade Agreements Act Compliant
This product is a product of Cambodia and a "designated country" end product that complies with the Trade Agreements Act
Other
Compatible Products
WFRL-GOOF-4R-6R-W
4"-6" Goof ring round white

WFRL-TRIM-4R-BS
4" Color trim round smooth black

WFRL-TRIM-4R-BRS
4" Color trim round smooth bronze

WFRL-TRIM-4R-BNS
4" Color trim round smooth brushed nickel

DLPLATE/WFR3468/NB
Mounting plate for 3", 4", 6", 8" with nailer bar

DLPLATE/WFR3456
Mounting plate for 3", 4", 5", 6" with nailer bar

DRI-25-EMGR-DC
Emergency driver 100-277V 25W

DRI-21-EMGR-DC-D10
Emergency driver 100-277V 21W 0-10V T20
5-Year, No-Compromise Warranty
RAB warrants that our LED products will be free from defects in materials and workmanship for a period of five (5) years from the date of delivery to the end user, including coverage of light output, color stability, driver performance and fixture finish. RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.

Recently Viewed Products

 This is a link to the product WFRL4R99FA120WBS WFRL4R99FA120WBS
Edge-Lit Wafer 4" 9W 750Lm 90Cri 5Cct 120V Triac/Elv Round White Shallow Baffle
 This is a link to the product HAZFFLED52TB44 HAZFFLED52TB44
Hazardous 6097 Lumens Hazled Ffled 52W Led Cool Trunnion 120V-277V 4X4 Gray
 This is a link to the product RDLED6S26D-50Y-M-W RDLED6S26D-50Y-M-W
Remodeler 6" Square 26W Dim 50 Degrees 3000K 80 Cri Matte Cone White Ring
 This is a link to the product ALEDM5T/WS2 ALEDM5T/WS2
Aled 78-90-150W T5 5000K Cool Arm Wattstop 20Ft Lens Bronze
 This is a link to the product RDDLED2S-10D-20YY-W-ST RDDLED2S-10D-20YY-W-ST
Recessed Downlights 949 Lumens Rddled 2 Inches Square 10W Dimmable 20 Degree 2700K 80Cri White Trim Cone Silver Trim Ring 1/2 Inch Trim
 This is a link to the product HALV10L935-FG2-S/MVS/E2 HALV10L935-FG2-S/MVS/E2
Architectural 796 Lumens Halv Forward Light 14W 90Cri 3500K Frosted Lens With Grill Style 2 Silver Finish Microwave Sensor Battery Backup
 This is a link to the product WFRL4R99FA120WBS WFRL4R99FA120WBS
Edge-Lit Wafer 4" 9W 750Lm 90Cri 5Cct 120V Triac/Elv Round White Shallow Baffle
 This is a link to the product HAZFFLED52TB44 HAZFFLED52TB44
Hazardous 6097 Lumens Hazled Ffled 52W Led Cool Trunnion 120V-277V 4X4 Gray
 This is a link to the product RDLED6S26D-50Y-M-W RDLED6S26D-50Y-M-W
Remodeler 6" Square 26W Dim 50 Degrees 3000K 80 Cri Matte Cone White Ring
 This is a link to the product ALEDM5T/WS2 ALEDM5T/WS2
Aled 78-90-150W T5 5000K Cool Arm Wattstop 20Ft Lens Bronze
Link to Live Chat

Contact us

A RAB support representative will respond soon.

Send a message
Link to Lighting Design

Lighting Design

Our lighting designers can help you create a custom layout.

Request Lighting Layout
Link to DLC qualified products

DesignLights Consortium®

Find DLC qualified products.

Learn More
Link to Where to Buy

Where to Buy

Find a distributor or RAB Sales Representative.

Go to Locator