• Pedestal Stand & Cable Management for EVC Chargers
  • Made from galvanized iron
  • Includes mounting hardware in box
View Technical Specs
Dimensions
Link to Dimension Drawing

Weight: 11.0 lbs

Technical Specifications
Product Overview
Product Type
Cable Management Add-On for EV Charger
Application
Commercial & public use
Construction
Housing Material
Galvanized iron
Installation
Mounting
Mounts driectly on top of EVP pedestal which allows addition of EVR retractors for cable management
Mounting Hardware Included
Yes
Other
Compatible Accessories
EVC48
EVC48/ND

EVC48/LCB
EVC40/LCB

EVC40
EVC33
3-Year Limited Warranty
Electric Vehicle Charger products will be free from defects in materials and workmanship for a period of (3) years from the date of original sale to RAB's distributor. The product shall be considered defective only if it cannot be brought back to service by assistance from RAB technical product support representative. If you have a technical issue or question regarding warranty, call our technical support team at RAB Help line. Exceptions apply as stated on product specification sheets incorporated herein by reference. Defects in material or workmanship do not include improper installation or operation, alterations, power surges or overheating due to external conditions. Defects caused by acts of vandalism and incidents beyond control of manufacturer resulting in inoperability of the electric vehicle charger are not covered by the material or workmanship warranty.

Recently Viewed Products

 This is a link to the product EVM EVM
Cable Management Add-On W/O Retractors For Evc Charger
 This is a link to the product ALEDXL3TB/480/WS2 ALEDXL3TB/480/WS2
Aled 300-345-385W T3 5000K Cool 480V Arm Wattstop 20Ft Lens Black
 This is a link to the product BAYLED104YW BAYLED104YW
High Bays 14773 Lumens Bayled 104W White
 This is a link to the product BOA-Y/S BOA-Y/S
Y Connector For Pendant Down Light Boa-Fa Silver
 This is a link to the product ORB4 ORB4
4'' Recessed Frameless Sumo 9W 5Cct Round White 120V Triac
 This is a link to the product LCCONTROL20/D10 LCCONTROL20/D10
Lightcloud Controller20 0-10V Dimming 120V-277V Black
 This is a link to the product EVM EVM
Cable Management Add-On W/O Retractors For Evc Charger
 This is a link to the product ALEDXL3TB/480/WS2 ALEDXL3TB/480/WS2
Aled 300-345-385W T3 5000K Cool 480V Arm Wattstop 20Ft Lens Black
 This is a link to the product BAYLED104YW BAYLED104YW
High Bays 14773 Lumens Bayled 104W White
 This is a link to the product BOA-Y/S BOA-Y/S
Y Connector For Pendant Down Light Boa-Fa Silver
Link to Live Chat

Contact us

A RAB support representative will respond soon.

Send a message
Link to Lighting Design

Lighting Design

Our lighting designers can help you create a custom layout.

Request Lighting Layout
Link to Where to Buy

Where to Buy

Find a distributor or RAB Sales Representative.

Go to Locator